At this job in Cullompton, Devon, we carried out the installation of a new Marsh Ensign 16 treatment plant for the duchy of Cornwall.
Within the new treatment plant installation, we laid a new main line which was 100 metres long across a grazing field and driveway to the new tank's position. The tank is served by two farm houses.
Upon completion of the treatment plant installation, our team concreted the sections of the pipeline which were under the roads. The tank was also encased in concrete and the outlet was taken to an existing pipe line which went to the stream in the bottom field.
This project was completed on time and came in under budget. |